Square Footage

Enter the total building square feet (footprint) of affected area.

Calendar Days

Enter the total number of calendar days you have to complete the project.

Mitigation Level (Production Rate)

Select the mitigation level for your project. These levels represent the intensity of the restoration effort based on established values extracted from 35 years of historical data and statistics of actual completed projects. Read the descriptions and choose the Mitigation Level that best describes your project.

Least Difficult

Level One

400+ sft. Daily Production Rate, per worker

Minimal damage; smoke, soot, water, (removal of drywall removal /sanitize $6 per sft.) horizontal surfaces only cleaning, no mold, no union labor, no prevailing wage, not a complex project, warehouse facilities, most residential, office building, hospitality, Educational facilities, no encumbrances such as elevator issues or heavily congested areas.

Level Two

200 sft. Daily Production Rate, per worker

Light to moderate damage; smoke, soot, water, light mold, all surface cleaning, selective demo, not a complex project, no union, no prevailing wage, all facilities, multi floors, minimal lifts, scaffolding, some museums, multiple floors, Office Space, Hospitality, Residential, Education, Warehouse, Multi Family, Retail, Entertainment Venue, Government, Churches.

Most Common

Level Three

150 sft. Daily Production Rate, per worker

Moderate damage, moderate complexity; water, soot, smoke, moderate mold, demo, moderate complex project, medical facilities, all structures including industrial, residential, multi-level office, lifts, scaffolding, possible union and/or prevailing wage, encumbrances: such as elevator issues, highly congested areas, limited access, moderate environmental, All Facilities

Level Four

115 sft. Daily Production Rate, per worker

Heavy damage, high security, complex project, union and/or prevailing wage, encumbrances: such as elevator issues, heavy PPE, highly congested areas, limited access, multi-level, high level environmental, Libraries, Museums, Industrial, Medical.

Most Difficult

Level Five

75 sft. Daily Production Rate, per worker

Heavy damage, high security, extremely complex project including union and/or prevailing wage, encumbrances, such as elevator issues, heavy PPE, highly congested areas, limited access, multi-level buildings, highest level environmental, confined space, heavy containment all facilities and levels.

Custom Level

Custom sft. Daily Production Rate, per worker (Enter below)

Choose this option to enter a custom production rate.

Example: Custom rate for Covid-19 work; 1200 -1,500 sft. per person per day.

STAFF LABOR COSTS

X Role Qty Days on Job Rate (Reg/Over) Hours (Reg/Over) Subtotal
Project Manager
Project Auditor
Supervisory Labor
Production Labor
+ Add Staff/Labor

Associated Project Costs

Calculated as a % of labor costs based on historical data. Adjust only if needed to meet your job requirements.

Supplies & Materials % of labor costs
Co. Owned & Rented (small) Equipment % of labor costs
Subcontractors % of labor costs
Subsistence
(travel costs, hotels, rental vehicles and per diem)
% of labor costs

Additional Vendor – Sub Contractor Costs

X Trade Vendor Notes Cost Markup % Total
+ ADD VENDOR

SPECIALTY SERVICES

Service Service Coverage Subtotal ($)
Document Drying

$85 per cubic ft.

Enter cubic ft.
Document Cleaning (based on cubic foot)

Lvl 1 Cleaning - 1-2 Hours ($65/cu.ft.)
Lvl 2 Cleaning - 3-4 Hours ($150/cu.ft.)
Lvl 3 Cleaning - 5-6 Hours ($250/cu.ft.)

Enter cubic ft.
DRYING, STABILIZATION & DEODORIZATION
Structural Drying

$ per square foot

Based on 30 day maximum
Enter square ft.
Ambient Stabilization

$ per square foot

Based on 30 day maximum
Enter square ft.
Ambient Deodorization

$ per square foot

Enter square ft.

GENERAL RECONSTRUCTION

Re-Construction Levels
Option for contractors doing reconstruction. Choose the amounts of drywall you'll need for this job, each tier has a 1/2 and 5/8 inch option. Select one or multiple tiers.
Drywall: Hung only (no tape or finished) (Drywall repair/replace only, no stud or superstructure replacement/repair). 1/2in - $3.07/sq ft 5/8in - $3.39/sq ft Square Ft.
Drywall: Hung and fire taped (Drywall repair/replace only, no stud or superstructure replacement/repair).
1/2in - $4.03/sq ft 5/8in - $4.39/sq ft
Square Ft.
Drywall: Hung, taped, ready for texture (Drywall repair/replace only, no stud or superstructure replacement/repair). 1/2in - $4.63/sq ft 5/8in - $4.90/sq ft Square Ft.
Drywall: Hung, taped, floated, ready for paint, Drywall repair/replace only, no stud or superstructure replacement/repair. 1/2in - $5.30/sq ft 5/8in - $5.58/sq ft Square Ft.
Drywall: Hung, taped, heavy texture, ready for paint , Drywall repair/replace only, no stud or superstructure replacement/repair. 1/2in - $6.19/sq ft 5/8in - $6.48/sq ft Square Ft.
Drywall: Hung, taped, heavy texture, ready for paint , Drywall repair/replace only, no stud or superstructure replacement/repair. 1/2in - $7.25/sq ft 5/8in - $7.61/sq ft Square Ft.
Drywall: Hung, taped, with smooth wall finish, Drywall repair/replace only, no stud or superstructure replacement/repair. 1/2in - $7.25/sq ft 5/8in - $7.61/sq ft Square Ft.
Drywall: Hung, taped, ready for texture, Drywall repair/replace only, no stud or superstructure replacement/repair. 1/2in - $10.47/sq ft 5/8in - $11.21/sq ft Square Ft.

TOTALS

Production Rate Labor Total Supply Total Vendor Total Specialty Total Re-Construction Total Price/Sq. Ft.
Quick Check
Project Estimate Total

© Copyright 2020 The Solutions Company, LLC © – Registered Patent Pending UNITED STATES PATENT AND TRADEMARK OFFICE App number: 63017200

Square Footage

Sq. Ft.

Calendar Days

Days

Mitigation Level (Production Rate)

150

Labor Costs

Supervisor(s) -
/hr --
Production Labor -
/hr --
Admin 1
/hr --
Project Manager(s) 1
/hr --
Additional Labor
/hr --
Check for Overtime (Labor +32%)

Associated Job Costs (% of labor cost)

Co. Owned Supplies & Materials

% --

Co. Owned Small Equipment

% --

Subcontractors

% --

Subsistence

% --

Structural Drying

Sq. Ft. --

Ambient Deodorization

Sq. Ft. --

Vendor & Purchased Supplies

$ (x 20%)

Reconstruction Costs

$

Miscellaneous Costs

$
Labor
Associated Job Costs
Drying
Deodorization
Vendor/Pur. Supplies
Reconstruction
Miscellaneous
Quick Check