Project Information
Contractor Name
Job Number
Customer Name
Phone
Location
Project Address
Date of Loss
Type of Loss
Regarding
Initial Customer Contact
Initial Company Contact
Project Descriptions
Square Footage
Enter the total building square feet (footprint) of affected area.
Calendar Days
Enter the total number of calendar days you have to complete the project.
Mitigation Level (Production Rate)
Select the mitigation level for your project. These levels represent the intensity of the restoration effort based on established values extracted from 35 years of historical data and statistics of actual completed projects. Read the descriptions and choose the Mitigation Level that best describes your project.
Least Difficult
Level One
400+ sft. Daily Production Rate, per worker
Minimal damage; smoke, soot, water, (removal of drywall removal /sanitize $6 per sft.) horizontal surfaces only cleaning, no mold, no union labor, no prevailing wage, not a complex project, warehouse facilities, most residential, office building, hospitality, Educational facilities, no encumbrances such as elevator issues or heavily congested areas.
Level Two
200 sft. Daily Production Rate, per worker
Light to moderate damage; smoke, soot, water, light mold, all surface cleaning, selective demo, not a complex project, no union, no prevailing wage, all facilities, multi floors, minimal lifts, scaffolding, some museums, multiple floors, Office Space, Hospitality, Residential, Education, Warehouse, Multi Family, Retail, Entertainment Venue, Government, Churches.
Most Common
Level Three
150 sft. Daily Production Rate, per worker
Moderate damage, moderate complexity; water, soot, smoke, moderate mold, demo, moderate complex project, medical facilities, all structures including industrial, residential, multi-level office, lifts, scaffolding, possible union and/or prevailing wage, encumbrances: such as elevator issues, highly congested areas, limited access, moderate environmental, All Facilities
Level Four
115 sft. Daily Production Rate, per worker
Heavy damage, high security, complex project, union and/or prevailing wage, encumbrances: such as elevator issues, heavy PPE, highly congested areas, limited access, multi-level, high level environmental, Libraries, Museums, Industrial, Medical.
Most Difficult
Level Five
75 sft. Daily Production Rate, per worker
Heavy damage, high security, extremely complex project including union and/or prevailing wage, encumbrances, such as elevator issues, heavy PPE, highly congested areas, limited access, multi-level buildings, highest level environmental, confined space, heavy containment all facilities and levels.
Custom Level
Custom sft. Daily Production Rate, per worker (Enter below)
Choose this option to enter a custom production rate.
Example: Custom rate for Covid-19 work; 1200 -1,500 sft. per person per day.
STAFF LABOR COSTS
X | Role | Qty | Days on Job | Rate (Reg/Over) | Hours (Reg/Over) | Subtotal |
Project Manager | ||||||
Project Auditor | ||||||
Supervisory Labor | ||||||
Production Labor |
Associated Project Costs
Calculated as a % of labor costs based on historical data. Adjust only if needed to meet your job requirements.
Supplies & Materials | % of labor costs | |
Co. Owned & Rented (small) Equipment | % of labor costs | |
Subcontractors | % of labor costs | |
Subsistence (travel costs, hotels, rental vehicles and per diem) |
% of labor costs | |
Additional Vendor – Sub Contractor Costs
X | Trade Vendor | Notes | Cost | Markup % | Total |
SPECIALTY SERVICES
Service | Service Coverage | Subtotal ($) | |
Document Drying | $85 per cubic ft. |
Enter cubic ft. |
|
Document Cleaning (based on cubic foot) | Lvl 1 Cleaning - 1-2 Hours ($65/cu.ft.) |
Enter cubic ft. |
|
DRYING, STABILIZATION & DEODORIZATION | |||
Structural Drying | $ per square foot Based on 30 day maximum |
Enter square ft. |
|
Ambient Stabilization | $ per square foot Based on 30 day maximum |
Enter square ft. |
|
Ambient Deodorization | $ per square foot |
Enter square ft. |
GENERAL RECONSTRUCTION
Re-Construction Levels Option for contractors doing reconstruction. Choose the amounts of drywall you'll need for this job, each tier has a 1/2 and 5/8 inch option. Select one or multiple tiers. |
Drywall: Hung only (no tape or finished) (Drywall repair/replace only, no stud or superstructure replacement/repair). 1/2in - $3.07/sq ft 5/8in - $3.39/sq ft | Square Ft. |
|
Drywall: Hung and fire taped (Drywall repair/replace only, no stud or superstructure replacement/repair). 1/2in - $4.03/sq ft 5/8in - $4.39/sq ft |
Square Ft. |
||
Drywall: Hung, taped, ready for texture (Drywall repair/replace only, no stud or superstructure replacement/repair). 1/2in - $4.63/sq ft 5/8in - $4.90/sq ft | Square Ft. |
||
Drywall: Hung, taped, floated, ready for paint, Drywall repair/replace only, no stud or superstructure replacement/repair. 1/2in - $5.30/sq ft 5/8in - $5.58/sq ft | Square Ft. |
||
Drywall: Hung, taped, heavy texture, ready for paint , Drywall repair/replace only, no stud or superstructure replacement/repair. 1/2in - $6.19/sq ft 5/8in - $6.48/sq ft | Square Ft. |
||
Drywall: Hung, taped, heavy texture, ready for paint , Drywall repair/replace only, no stud or superstructure replacement/repair. 1/2in - $7.25/sq ft 5/8in - $7.61/sq ft | Square Ft. |
||
Drywall: Hung, taped, with smooth wall finish, Drywall repair/replace only, no stud or superstructure replacement/repair. 1/2in - $7.25/sq ft 5/8in - $7.61/sq ft | Square Ft. |
||
Drywall: Hung, taped, ready for texture, Drywall repair/replace only, no stud or superstructure replacement/repair. 1/2in - $10.47/sq ft 5/8in - $11.21/sq ft | Square Ft. |
TOTALS
Production Rate | Labor Total | Supply Total | Vendor Total | Specialty Total | Re-Construction Total | Price/Sq. Ft. Quick Check |
Project Estimate Total |
© Copyright 2020 The Solutions Company, LLC © – Registered Patent Pending UNITED STATES PATENT AND TRADEMARK OFFICE App number: 63017200
Square Footage
Sq. Ft.Calendar Days
DaysMitigation Level (Production Rate)
150Labor Costs
/hr --
/hr --
/hr --
/hr --
/hr --